Frequently Asked Questions about Our Playground Equipment

Browse our comprehensive FAQs to get answers to common questions about our rides. Whether you are new to rides or are looking for a reliable supplier to work with, our FAQs will provide you with practical reference and help. Answer one question at a time to simplify your ride customization journey.
Product Inquiry

FAQ

  • Q How thick should impact-absorbing surfacing be under playground equipment?

    A

    Yes, but only if the installation includes a proper shock-absorbing layer under the equipment. EN 1176 does not measure how thick a safety surface must be in millimetres; it measures whether the surface reduces the impact of a fall to a stated limit at the height of the highest fall point above the surface. The thickness follows from that test result, and the certificate for the installed combination of equipment and surfacing is what a buyer should ask for.

    How is the required thickness actually determined?

    Two separate measurements are involved. The impact attenuation test drops a shaped headform from the specified fall height onto the surface and measures the peak deceleration, with a limit of 200 g for a playground surface. The critical fall height (the height from which a fall could cause serious injury) of the equipment is fixed for each piece of equipment. The surface must attenuate a fall from that height within the limit, and because thicker material generally attenuates better, a higher critical fall height requires a deeper layer. In practice, a fall height of 2 m usually needs about 50 mm of rubber granule or 40 mm of engineered wood fibre, while a 3 m fall height generally calls for 70 mm of rubber or 60 mm of wood fibre, but these are only starting points and the supplier's own test data decides.

    Which surfaces meet the standard?

    Three families cover most projects. Rubber granule bound with polyurethane, poured wet to a compacted base, is the most flexible and is available in a wide range of colours. Engineered wood fibre is a cost-effective option that also meets impact requirements, with a natural brown surface that blends into a landscape setting. Rubber tiles are the third choice, easier to install and replace, and they are the most practical where the surface must be laid in sections around a complex equipment layout. A fourth material, sand, is only acceptable in a loose form at a depth of at least 40 cm and it cannot be used where equipment requires a fixed anchoring surface, so it rarely appears in a formal specification.

    What about loose fill and depth?

    Loose fill such as engineered wood fibre, sand, or rubber granule must be installed to a stated depth and needs regular raking and topping up, because children displace the material during play and the depth falls below the required level. The installer should state the required depth, the expected settling rate, and the maintenance interval. A critical detail is that the depth is measured after compaction, not before, and that edge restraints must be installed so that the material cannot migrate into the surrounding grass or paving.

    What should a buyer confirm before ordering?

    Ask for the impact attenuation test report and the critical fall height it covers, and check that the figure matches the highest fall point of the equipment being installed on that surface. Confirm the installed depth in millimetres rather than the loose volume in cubic metres, and ask who is responsible for the compaction and the base preparation. For an inclusive play area, request the test data for a fall height of 3 m, since standard figures are often quoted for 2 m only. Finally, check the drainage design, because standing water under a bound surface will eventually break the bond between the granules and the binder, and confirm the maintenance regime and the expected service life in years before the surface needs full replacement.

  • Q How long does a custom playground project take to deliver?

    A

    What determines the delivery time

    Delivery time on a playground project is decided by three separate intervals, and buyers should price each one separately: production lead time, transport time, and site installation time. Production is usually the longest of the three, because steel fabrication, welding, hot-dip galvanising or powder coating, and assembly all happen before anything is loaded. Transport depends on the shipping method and the destination port. Installation depends on whether the ground surfacing and foundations are already complete when the equipment arrives.

    Typical lead times by project type

    For catalogue-style equipment held in stock, production usually takes 7 to 15 working days. For a semi-custom configuration, in which standard components are combined with a modified deck, roof, or colour scheme, expect 30 to 45 days. For a fully custom playground built from a project drawing, 45 to 90 days is a realistic planning figure, and this figure should be written into the contract as a range rather than a single day.

    What shortens or delays the schedule

    The single most common cause of delay is late approval of the drawing. Every week the layout drawing sits unsigned adds roughly a week to production, because drawings cannot be released to the workshop. Colour selection in RAL or Pantone references has the same effect if the sample is not signed off. On the transport side, sea freight to European ports typically runs 25 to 35 days, and container consolidation adds another 7 to 10 days, while air freight cuts transit to 3 to 5 days at a much higher cost per cubic metre. For full container loads of 20-foot or 40-foot units, the equipment usually leaves as a mixed or project cargo consignment rather than a standard container, which is a commercial point worth settling before the order is placed.

    How to verify the schedule before you order

    Ask for the schedule in writing and check that it names the approved drawing revision, the production completion date, the booking reference, and the installation start date. Confirm the same dates in the signed contract and in the commercial invoice, and confirm that a third-party inspection under EN 1176 or ASTM F1487 is booked before the goods leave the factory rather than after they arrive. A supplier who states these milestones in a dated document, and who accepts inspection results as a condition of shipment, is giving you a schedule that can be checked.

  • Q How do rubber safety surfacing tiles compare with poured rubber surfacing for a playground?

    A

    Yes. Rubber surfacing lasts between 8 and 12 years when it is installed correctly, and the shorter end of that range applies to sites with heavy use or intense ultraviolet exposure. The material is a polyurethane bound rubber granule layer poured wet onto a prepared sub-base, and its service life depends on three things: the thickness of the layer, the quality of the installation, and the amount of traffic it carries.

    What thickness should be specified?

    Depth is the first factor. For a play area serving children between three and six years old, the installed layer is commonly between 6 mm and 10 mm above the aggregate base. Thinner layers in the 4 mm to 6 mm range suit areas with a low fall height, while heavier duty areas need 10 mm or more. Buyers should also confirm the critical fall height figure in the product documentation and check it against the highest fall height of the equipment above that surface, because a layer that is too thin will not cushion a fall as designed.

    Which installation details decide how long it lasts?

    Preparation below the surface matters more than most buyers expect. The sub-base must be compacted, well drained, and laid to a consistent level, since any settlement will create hollow areas where the surface lifts and tears. The granules must be mixed with the correct ratio of polyurethane binder, and the pour must be compacted with a roller rather than trowelled flat, because trapped air becomes a weak spot. Edge and joint detailing is where failures usually start. Anchors, drains, and equipment base plates are set flush and sealed, and expansion joints are placed at the correct spacing so that thermal movement does not open cracks.

    How is wear and damage handled?

    A sound installation shows gradual flattening and slight colour change rather than tearing. Punctures, tears, and separating seams are early warning signs that the layer was too thin or poorly bonded, and those areas need cutting out and patching rather than covering. Heavy-duty areas in schools and public squares often show wear in the traffic lanes first, so rotating or refreshing the surfacing in those zones before the whole area fails is a practical maintenance step. Cleaning should use a soft brush and clean water, and no harsh solvent or high-pressure jet should be used, since solvents attack the polyurethane binder.

    What should a buyer check before ordering?

    Ask for the granule mix ratio, the layer thickness in millimetres, the binder type, and the warranty period with its stated exclusions. Confirm that the installer will photograph the compaction of the sub-base before the pour, because that image is the only evidence of what lies under the finished surface. Also check that the supplier can document compliance with EN 1176 impact attenuation requirements for the stated critical fall height, and confirm the drainage design, since standing water under the surface will break the bond no matter how good the material is.

  • Q Should I choose stainless steel or galvanized steel for outdoor playground equipment?

    A

    Stainless steel and galvanized steel are both used for outdoor playground equipment, and neither is universally stronger. The right choice depends on the climate at the site, the position of the part, and the expected maintenance budget over ten years. Galvanized steel gives stronger structural performance for the frame and posts, while stainless steel resists corrosion in coastal and humid locations where salt and moisture collect quickly.

    What is the difference between the two finishes?

    Galvanized steel is coated with a layer of zinc, usually applied by hot-dip galvanizing at a thickness measured in micrometres or in grams per square metre. The zinc protects the steel both physically, as a barrier, and chemically, because a zinc surface adjacent to damaged steel forms a protective oxide that slows further corrosion. Stainless steel contains a minimum of about 10.5 percent chromium, which forms a self-healing passive layer that recovers when it is scratched. That passive layer is why stainless does not need a separate coating, but it is also why stainless cannot be welded like ordinary steel without controlling the weld zone.

    Which one holds up better at a specific site?

    Read the site, not the product sheet. Coastal locations, swimming pool surrounds, and areas with de-icing salt on the ground need stainless steel or a hot-dip galvanized coating with a heavier zinc thickness. Dry inland sites with moderate rainfall are well served by standard hot-dip galvanizing. Frequent immersion in water is a different case again, because a coating breach underwater corrodes faster than a coating breach in air, so stainless or a duplex grade is the safer selection there. Ask the supplier for the coating thickness in microns and the steel grade number, and confirm that all welds are coated after fabrication rather than painted before assembly.

    How does maintenance change between them?

    Maintenance effort is where the two separate most clearly. Galvanized parts need almost no attention for the first several years, but scratches in the coating can rust, and a zinc-rich paint or cold galvanizing compound is used to repair small damaged areas. Stainless steel tolerates cleaning agents better, but surface contamination must still be removed, and chloride deposits left on stainless near pools eventually cause pitting. Neither finish excuses the need for drainage. Water standing in bolt holes and hollow sections causes damage in both materials, so welded hollow sections should be capped or sealed at the factory.

    What should a buyer check before ordering?

    Ask for three things in writing: the steel grade or zinc coating thickness, the coating repair method the manufacturer uses at the factory, and the warranty period with its stated exclusions. A written specification protects the buyer because it turns a general claim such as heavy duty into a measurable value. Buyers should also confirm that the supplier welds and coats in one controlled workshop, since field welding after coating leaves bare areas that will corrode from the inside. Finally, confirm that the same specification applies to the parts buried in the ground, because base plates and anchors spend their life in wet soil and are the first place failure shows.

  • Q How often is a playground EN 1176 annual inspection required?

    A

    Yes. EN 1176 annual inspection is a documented routine check carried out by a competent inspector, and it normally takes one working day for a single play area. The inspection covers the whole equipment set, the surfacing underneath it, and the surrounding fall zones, and it produces a written report listing anything that needs repair.

    Who is allowed to carry out the inspection?

    EN 1176 does not require a specific job title, but it does require competence. A competent person is someone with training, experience, and knowledge of EN 1176 parts 1 to 11, plus practical familiarity with the equipment type being inspected. Many operators use a third-party playground safety inspector or a certified playground safety course graduate, and some manufacturer warranty terms require inspection by an independent party.

    What does the inspection actually cover?

    The check has four layers. First comes the equipment: welds, joints, bolts, ropes, chains, bearings, spring anchors, and moving parts are examined for wear, deformation, and play in the connections. Second is the surfacing: impact attenuation is measured at defined test points, and the depth of loose-fill material or the condition of a poured surface is recorded. Third the fall zones are measured in every direction from each free fall height, and clearance is confirmed. Fourth comes the surrounding area: fencing, gates, signage, drainage, and objects that a child could reach during a fall.

    What must the report contain?

    A useful report identifies each item by the equipment name and its position, states what was checked, and grades the finding. It should separate defects that need immediate closure from defects that can stay in service until the next visit. Items such as protruding bolts, exposed concrete edges, entrapment openings at the head, or surfacing depth below the stated fall height normally require the equipment to be taken out of use straight away. The report also records the date, the inspector's name, the standard version used, and the next inspection due date.

    How often is the inspection required?

    Routine inspection is weekly to daily depending on the intensity of use, and a detailed operational inspection is typically carried out every three months for heavily used equipment. The full annual inspection is the one most buyers ask about, and it must be repeated every twelve months. Records should be kept for at least three years so that the operator can show a continuous history of compliance. After any major change, such as adding an extension, replacing a rope net, or altering the surfacing depth, a fresh inspection is needed before the area reopens.

  • Q What payment terms are normal for a playground equipment order?

    A

    What a playground equipment order usually costs to start

    Most playground equipment suppliers work on a deposit structure rather than on full payment up front, and the usual pattern is a deposit of 30 percent of the contract value, a payment of 70 percent against the inspection report once the equipment is finished, and the balance settled against the shipping documents. The proportions are negotiable and they depend on how much risk the supplier is carrying, but the structure itself is standard because it covers the buyer's production financing on one side and the supplier's material purchases on the other. A quote that asks for full payment before production starts deserves an explanation, and so does a quote that asks for nothing until the goods have already been shipped.

    The two places where cost changes after the order is placed

    The first is the drawing. Every layout drawing that is revised after the deposit has been paid costs engineering time, and the charge is usually per revision rather than per hour, so the number of revision rounds matters more than the size of each change. Approve the general arrangement drawing and the equipment list in one pass before the production drawing is released, because revisions after that point are the most common source of a variation invoice. The second place is shipping. A project quoted as a consolidated sea freight consignment can become more expensive when the packed volume exceeds the container allowance, and a change of destination after booking is charged at the rate that applies on the day the booking is amended. Both are worth fixing in writing before the deposit is paid, not after.

    How to compare a quotation against a land price

    Compare quotations on the same basis, because the lowest headline figure is often the one that excludes the most. Check whether the price includes foundations and anchor bolts, impact-absorbing surfacing, the safety inspection certificate, the test report for the exact model, freight to the named port, insurance, and the removal of packaging. A comparison is only valid if the scope is identical on both sides, and a quotation that is short by two paragraphs of scope will look cheaper for the wrong reason. Ask each supplier to state the scope in a numbered list and to confirm the total in the same currency, because a quotation that adds a validity period is telling you that the price is conditional on something.

    What to check in the payment terms before the deposit goes out

    Ask three specific questions. Who holds the payment, and is it a company with a registered address in the country of manufacture or an intermediary. What document triggers each payment, and is that document one you can verify yourself rather than one the supplier issues. And what happens if the goods fail inspection, since the inspection report is normally the trigger for the second payment and the report is written against the model number on the order. A contract that names the inspection body, the standard it is written against, and the bank account details that match the supplier's registered name is a contract that can be checked, and a payment instruction that asks for an account under a different name or in another country is a reason to stop before the money moves.

  • Q What information should I include in an RFQ for playground equipment?

    A

    What a usable RFQ has to contain

    A playground equipment RFQ is only usable when it states six things in writing: the site dimensions, the age range the equipment must serve, how many children will use the site at peak time, the standard the project must meet, the target delivery date, and the destination port or city. Every other line in the enquiry is decoration. When those six are missing, the quotations that come back are catalogue selections with a price attached, and the drawings, the site survey and the permit work all fall back onto the buyer at a stage when the budget is already committed.

    Site information that removes guesswork

    Send a dimensioned site plan with levels marked, and state the areas that cannot be built on. A rectangular plot is the easy case, and the difference between an easy and a difficult site is often one fifth of the usable area. Irregular boundaries, an existing path network, a watercourse, a retaining wall, overhead lines and the position of the entrance all remove area that would otherwise carry equipment, and each of them changes the layout rather than just the cost. A site plan with a scale bar and a north arrow lets the supplier draw to the correct proportions, and a set of photographs taken from the same four corners records what the plan cannot show, such as access for a delivery vehicle and the height of vegetation to be cleared.

    Age range, capacity and the standard

    State the age range first, because it decides the fall heights, the component sizes and the amount of clear space the site has to provide. Under EN 1176-1 the equipment and the surfacing below it are matched to the age group, and a structure sized for older children produces fall heights that a preschool site cannot accommodate. Give the expected child numbers at peak time as well, since capacity is a space calculation: the usable area divided by how many children will use it gives the square metres per child, and the free space around each item counts as area rather than as extra. Name the standard and the market in the enquiry, because a European project is assessed against EN 1176, a North American project against ASTM F1487, and a Canadian project against CSA Z614.

    Commercial terms that make quotations comparable

    Ask for the price on a stated Incoterm, and state the destination port or city so that freight, insurance and duty treatment can be compared between suppliers. The same equipment quoted EXW and delivered to a European port can differ by 20 to 30 percent once freight, packing and inland transport are counted, and a quotation that does not name the term cannot be compared with any other. Also state whether the quotation should include surfacing, foundations, installation and removal of packaging, because these are frequently excluded and reappear as a variation order after the order is placed. Where the project has a fixed opening date, give that date together with the latest acceptable delivery date, and ask the supplier to confirm the production milestone as well as the shipping milestone.

    How to check the quotations you receive

    Compare the quotations line by line against the six points above, and treat any quotation that leaves one of them unanswered as incomplete rather than as the strongest offer. Ask each supplier to state the steel grade, the coating system, the model number used on the test report, and the lead time in working days. Check that the model number on the test report matches the model number in the quotation, because a certificate that carries no model number does not establish that the delivered equipment is the tested equipment. A quotation that answers every one of the six points, names the drawing revision it is based on, and offers inspection by a third party before the goods leave the factory is a document that can be checked later, and that is the standard the enquiry itself should set.

  • Q How long does it take to deliver a custom playground project?

    A

    What determines the delivery time

    Delivery time on a playground project is decided by three separate intervals, and buyers should price each one separately: production lead time, transport time, and site installation time. Production is usually the longest of the three, because steel fabrication, welding, hot-dip galvanising or powder coating, and assembly all happen before anything is loaded. Transport depends on the shipping method and the destination port. Installation depends on whether the ground surfacing and foundations are already complete when the equipment arrives.

    Typical lead times by project type

    For catalogue-style equipment held in stock, production usually takes 7 to 15 working days. For a semi-custom configuration, in which standard components are combined with a modified deck, roof, or colour scheme, expect 30 to 45 days. For a fully custom playground built from a project drawing, 45 to 90 days is a realistic planning figure, and this figure should be written into the contract as a range rather than a single day.

    What shortens or delays the schedule

    The single most common cause of delay is late approval of the drawing. Every week the layout drawing sits unsigned adds roughly a week to production, because drawings cannot be released to the workshop. Colour selection in RAL or Pantone references has the same effect if the sample is not signed off. On the transport side, sea freight to European ports typically runs 25 to 35 days, and container consolidation adds another 7 to 10 days, while air freight cuts transit to 3 to 5 days at a much higher cost per cubic metre. For full container loads of 20-foot or 40-foot units, the equipment usually leaves as a mixed or project cargo consignment rather than a standard container, which is a commercial point worth settling before the order is placed.

    How to verify the schedule before you order

    Ask for the schedule in writing and check that it names the approved drawing revision, the production completion date, the booking reference, and the installation start date. Confirm the same dates in the signed contract and in the commercial invoice, and confirm that a third-party inspection under EN 1176 or ASTM F1487 is booked before the goods leave the factory rather than after they arrive. A supplier who states these milestones in a dated document, and who accepts inspection results as a condition of shipment, is giving you a schedule that can be checked.

Gallery

More >>
  • 2025 Outdoor Playground
  • 2024 Indoor Playground
  • Letu Indoor Playground Project Case
  • 2025 Letu outdoor playground projects profile
  • 2025 Indoor Playground
  • 2025 Nuutooo play catalog
  • Cute Pet Playground Equipment
  • 2025 Early Childhood Education Equipment

Download Catalogue

2026-01-12 192

Letu outdoor playground projects profile.pdf

2026-01-12 624

2025 Outdoor Playground.pdf

2026-01-12 153

Cute Pet Playground Equipment.pdf

2026-01-12 192

2025 Indoor soft set.pdf

2026-01-12 167

2026 Indoor Playground.pdf

2026-01-12 164

2025 Nuutooo play catalog.pdf

2026-01-12 157

2024Indoor Playground.pdf

2026-01-12 153

2025 Indoor Playground.pdf

Address

Mr. Xu
   xu@nuutoo.com
   +86 15306887188
  +86 15306887188
  Wenzhou, Yongjia County, Wenzhou City Letu Amusement Equipment Co., Ltd.

Quick Links

Product Links

Subscription

Leave a Message
Product Inquiry
Copyright @ Wenzhou Letu Amusement Equipment Co., Ltd., ALL RIGHTS Reserved. Rrsxml Site Map      浙ICP备17042212号-4